This project proposal envisages the purchase of new plant for production of polymer modified bitumen (Measure 1), an automated system for monitoring energy consumption (Measure 2) and a new, energy efficient mechanical ventilation system to recover residual heat (Measure 3). The new equipment has a higher performance and lower power consumption. Intended to purchase plant for production of polymer modified bitumen has an average operating current power 228 kW, and average cost of natural gas 80 m³ / h. Its average productivity is 20 tons. / Hr. Monitoring System installation of Measure 1 consists of: 1) energy management software, and 2) electric meter board - a board with elktromer to measure power consumption. It plans to build a mechanical ventilation system to recover the residual heat in the room, which is used to repair workshop. Maximum flow ventilation is 360 cubic meters / hr., And the maximum expected performance of recuperation is 71%. New technological equipment is high-end with low fuel consumption, which in turn will lead to increased savings CO2 emissions into the atmosphere. Beneficiary provides the project to introduce a system of energy management / energy management / certification and BS EN ISO 50001. These actions will reduce the cost of energy resources, limiting the consumption of energy resources and thus - protection environment. The project will be a turnaround 18 months and a total value 558 686.00 BGN, VAT excluded.
Overview
Status | Closed (completion date) |
---|---|
Start date | 09 Aug, 2017 |
End date | 20 Feb, 2019 |
Contract date | 09 Aug, 2017 |
Programme
Beneficiary
Financial information
Total cost | 558,686.00 |
---|---|
Grant | 388,524.48 |
Self finance | 170,161.52 |
Total paid | 388,130.52 |
EU participation percent | 85.0% |
Location