The main activity of FILPLAST Ltd. is a production of blasting and injection molded products and manufacturing of tooling - dies (sector characterized by high energy intensity). The main need of the company is related to improving energy efficiency for sustainable growth and competitiveness. Satisfying this need is the main objective of the project which will be implemented through the following activities: 1. Acquisition of new manufacturing equipment 2. Acquisition of a system for monitoring energy consumption incl hardware and software The activity of selecting a contractor to prepare an energy audit is completed prior to submission of the project proposal. Through the implementation of the above activities, including energy efficiency measures included in the approved SEDA energy report (Statement № BG16RFOP-913/17.10.2016) will achieve the following key results: 1. delivered, installed and commissioned production equipment - Multi-sensory precision measuring machine (1pc.) Injection molding machine (1pc.) Inverter screw compressor (1pc.) Four wheel electrocar (1pc.) 2. delivered, installed and put into operation a system for monitoring energy consumption 3. filled activities for environmental protection 4. energy savings - 200 851 kWh /year 5. emission savings CO2 - 135.52 t/year 6. vizualization of the project Through the implementation of project activities and achieve planned results will expand the capacity of existing shed, will reduce the cost of unit production, will develop environmentally sound production and improve energy efficiency of the company.
Overview
Status | Closed (completion date) |
---|---|
Start date | 18 Aug, 2017 |
End date | 13 Dec, 2018 |
Contract date | 18 Aug, 2017 |
Programme
Beneficiary
Financial information
Total cost | 378,500.00 |
---|---|
Grant | 266,250.00 |
Self finance | 112,250.00 |
Total paid | 265,381.33 |
EU participation percent | 85.0% |
Location