The main activity of the MIS VANINI Ltd. is a production of women's apparel. The main need of the company is related to improving energy efficiency for sustainable growth and competitiveness. Satisfying this need is the main objective of the project which will be implemented through the following activities: 1. Acquisition of new manufacturing equipment 2. Perform works of industrial building 3. Improving the efficiency of cooling 4. Utilization of residual heat by duct 5. Construction of a roof photovoltaic power plant 6. Acquisition of a system for monitoring energy consumption 7. Consulting services for introduction and certification of energy management system in accordance with standard ISO 50001 The activity of selecting a contractor to prepare an energy audit is completed prior to submission of the project proposal. Through the implementation of the above activities, including energy efficiency measures included in the approved SEDA energy report (Statement № BG16RFOP-771 /30.09.2016) will achieve the following key results: 1. delivered, installed and commissioned production equipment - Robot automatic cutting (1pc.) Cooling System (1pc.) 2. activities performed works 3. improved efficiency of cooling by delivered and installed cooling system (1pc) 4. utilized residual heat 5. built rooftop photovoltaic power plant 6. delivered, installed and put into operation a system for monitoring energy consumption 7. received a certificate in accordance with standard ISO 50001 8. filled activities for environmental protection 9. The annual energy savings - 110 836 kWh/year 10. emissions saved CO2 - 51.49 t/year Through the implementation of project activities and achieve planned results will expand the capacity of existing shed will reduce the cost of unit production, will develop environmentally sound production and improve energy efficiency of the company.
Overview
Status | Closed (completion date) |
---|---|
Start date | 18 Aug, 2017 |
End date | 26 Feb, 2019 |
Contract date | 18 Aug, 2017 |
Programme
Beneficiary
Financial information
Total cost | 452,200.00 |
---|---|
Grant | 320,740.00 |
Self finance | 131,460.00 |
Total paid | 319,923.35 |
EU participation percent | 85.0% |
Location