The main activity of TANATOS Ltd. is construction of transmission and distribution pipelines. The core demand of the company is to improve energy efficiency for sustainable growth and competitiveness. Satisfying this demand is the main objective of the project which will be implemented through the following activities: 1. Acquisition of new manufacturing equipment 2. Consultancy services for implementation and certification of energy management system in accordance with standard BDS EN ISO 50001 The activity of selecting a contractor to prepare an energy audit is completed prior to submission of the project proposal. Activities for the preparation of financial audit will be carried out after the delivery, installation and commissioning of production equipment and obtained the certificate of ISO 50001 and the expense are of the applicant. Through the implementation of the above activities, including energy efficiency measures included in the approved SEDA energy report (Statement № BG16RFOP-187/02.09.2016) will achieve the following results: 1. delivered, installed and commissioned production equipment:Mobile Jaw Crusher; Mobile double deck scalper; Crawler Excavator enhanced bucket, hydraulic hammer and the hydraulic clamp; Wheel front loader enhanced hydraulics; Multipurpose wheeled excavator loader; Vibration single drum roller; Vibration double drum roller; Trencher roller with remote control; Mini excavator 2. received a certificate in accordance with standard BDS EN ISO 50001 3. filled activities for environmental protection 4. financial audit 5. energy savings - 1 127 517 kWh/year 6. emission savings CO2 - 301,047 t/year Through the implementation of project activities and achieve planned results will expand the capacity of existing shed will reduce the cost of unit production, will develop environmentally sound production and improve energy efficiency of the company.
Overview
Status | Closed (completion date) |
---|---|
Start date | 21 Aug, 2017 |
End date | 06 Dec, 2018 |
Contract date | 21 Aug, 2017 |
Programme
Beneficiary
Financial information
Total cost | 2,138,500.00 |
---|---|
Grant | 1,499,930.00 |
Self finance | 638,570.00 |
Total paid | 1,499,930.00 |
EU participation percent | 85.0% |
Location