"Improving the energy and resource efficiency "Bulgaria Eco 2009 "Ltd. through the purchase of new energy efficient equipment"

The project provides for the purchase, delivery, installation and commissioning of new wheel loader (Measure 1) and new classifier and mobile screen (Measure 2). The new equipment has a higher performance and lower energy consumption per unit of output. Wheel loader has a 6-cylinder engine with a capacity of 6.7 liters, electronic control and nominal output 143 kW / 192 hp Loader is equipped with a bucket volume of 3.75 cubic meters / hr., And the average productivity of the machine is 364 t. / H. The new classifier is hydraulically driven and maximum performance 70 cubic meters or 105 t / h - depending on the material. Equipment has the advantage of being a greater capacity to recover depending on the type and size of the material, economical service and high rate of recovery of the fine fraction. Mobile screen has an electric motor with power 37 kW and a volume of 8 cubic meters bunker One of the functions of the sieve is sifted and washed unfit for use inert material to a final fraction suitable for making concrete, concrete mixtures, mortars and other needs for construction. Another major feature is its use for screening and sorting of recycled material from the crusher. All this, and given the almost complete automation of production will lead to significant energy savings and higher productivity for the company. Beneficiary provides the project to introduce a system of energy management / energy management / certification and BS EN ISO 50001. These actions will reduce the cost of energy resources, limiting the consumption of energy resources and thus - protection the environment, and continuously measuring and analyzing the energy efficiency. The project will be a turnaround 18 months and a total value 912 254.00 BGN, VAT excluded.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 09 Aug, 2017
End date 06 Dec, 2018
Contract date 09 Aug, 2017
View in UMIS

Financial information

Total cost 912,254.00
Grant 646,157.80
Self finance 266,096.20
Total paid 645,787.00
EU participation percent 85.0%