The main activity of PROGALVIS Ltd. is a surface treatment and coating of metal. The main need of the company is related to improving energy efficiency for sustainable growth and competitiveness. Satisfying this need is the main objective of the project which will be implemented through the following activities: 1. Acquisition of new manufacturing equipment 2. Acquisition of a system for monitoring energy consumption incl hardware and software 3. Utilization of residual heat 4. Consultancy services for implementation and certification of energy management system in accordance with standard BS EN ISO 50001 The activity of selecting a contractor to prepare an energy audit is completed prior to submission of the project proposal. Through the implementation of the above activities, including energy efficiency measures included in the approved SEDA energy report (Statement № BG16RFOP-868/18.10.2016) will achieve the following key results: 1. delivered, installed and commissioned production equipment - Automatic line for galvanizing (1 pc) 2. delivered, installed and commissioned a system for monitoring energy consumption incl hardware and software 3. utilized residual heat 4. received a certificate in accordance with standard BS EN ISO 50001 5. filled activities for environmental protection 6. energy savings - 25 051,14 kWh/year 7. emission savings CO2 - 20,517 t/year 8. vizualization of the project Through the implementation of project activities and achieve planned results will expand the capacity of existing shed will reduce the cost of unit production, will develop environmentally sound production and improve energy efficiency of the company.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 09 Aug, 2017
End date 13 Dec, 2018
Contract date 09 Aug, 2017
View in UMIS

Beneficiary

Financial information

Total cost 543,100.00
Grant 383,970.00
Self finance 159,130.00
Total paid 383,880.00
EU participation percent 85.0%

Location