Increasing the energy efficiency of MARKONI-TRANS

The company "Marconi Trans" Ltd. is located in the town of Smolyan with offices and facilities in RUDOZEM. The company has construction machinery and specializes in excavation work. She is an active market in Bulgaria since 1997. He is a member of the Construction Chamber since the beginning of 2000, "Marconi Trans" Ltd. is a member of the Consortium "Living Water." Over the years, "Marconi Trans" Ltd. participated as a performer many infrastructural projects in Rudozem such as sewerage and water supply village Chepintsi, pressure tank and water supply network in the village. Plovdivtsi, strengthening of landslides and landslips common. Rudozem, water and sanitation village of Mugla, construction and repair of many forest roads to s.Breza, swish. Sanevska with. Gramade, neighborhood "Dobreva cherry" and many others, construction of retaining (stiffening) walls in the. Chepintsi; on the road "Smolyan-Pamporovo" on time "Teshel-Jagodina-Trigrad" approach to the graveyard Roudozem. The company is actively involved in winter maintenance of the road network in the municipality of Rudozem, as three years is the main contractor on all routes in the municipality. "Marconi Trans" Ltd. is an active participant in road construction sites of national importance as larger are "Maritza motorway - LOT 2 Dimitrovgrad, Harmanli", where he worked from discovery to completion of the facility in 2014 and then continued work LOT 1 / of the same highway /; "Reconstruction of road III - 867 Madan - Zlatograd Benkovski" reconstruction and construction of an overpass in the city of Burgas / detour to the town of Sozopol /. The project envisages the purchase of a number of hydraulic excavator (Measure 1) ventilation system (Measure 2) in the production facility for recovery of residual heat and monitoring systems for energy (Measure 3) Measure 1 - Hydraulic Excavator and will be full 18 months.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 09 Aug, 2017
End date 20 Feb, 2019
Contract date 09 Aug, 2017
View in UMIS

Beneficiary

Financial information

Total cost 434,909.59
Grant 312,016.71
Self finance 122,892.88
Total paid 311,839.70
EU participation percent 85.0%

Location