Increasing energy efficiency in AV BILD Ltd.

The main activity of AV BILD Ltd is construction and repair works, finishing works, landscaping and all basic and additional work in the construction field. The core demand of the company is to improve energy efficiency for sustainable growth and competitiveness. Satisfying this demand is the main objective of the project which will be implemented through the following activities: 1. Acquisition of new manufacturing equipment 2. Acquisition of a system for monitoring energy consumption (cost and fuel consumption), incl hardware and software 3. Consulting services for introduction and certification of energy management system in accordance with standard BDS EN ISO 50001 The activity of selecting a contractor to prepare an energy audit is completed prior to submission of the project proposal. Through the implementation of the above activities, including energy efficiency measures included in the approved SEDA energy report (Opinion № BG16RFOP-227 /18.08.2016) will achieve the following key results: 1. delivered, installed and commissioned production equipment - Backhoe loader (2 pcs); Mini wheel loader (2 pcs); Roller (1pc) 2. delivered, installed and put into operation a system for monitoring energy consumption (cost and fuel consumption), incl hardware and software 3. received a certificate in accordance with standard BDS EN ISO 50001 4. filled activities for environmental protection 5. The annual energy savings - 234 025 kWh/year 6. emissions saved CO2 - 62,49 t/year 7. vizualization of the project Through the implementation of project activities and achieve planned results will expand the capacity of existing shed will reduce the cost of unit production, will develop environmentally sound production and improve energy efficiency of the company.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 21 Aug, 2017
End date 20 Jul, 2018
Contract date 21 Aug, 2017
View in UMIS

Beneficiary

Financial information

Total cost 553,800.00
Grant 390,860.00
Self finance 162,940.00
Total paid 390,720.00
EU participation percent 85.0%

Location