Improving energy efficiency in "VASSILEVA STONE" EOOD

This project will be implemented by VASSILEVA STONE EOOD, a company specialising in the processing of natural stone tiling materials. Marble, granite and limestone are the main materials used for the production of the following product groups: kitchen countertops and countertops, stairs, bathroom countertops, fireplaces, columns, pilasters and balustrades, facade tiling and flooring, arches and cornices, fountains, etc. The project foresees the implementation of measures aimed to improve the energy efficiency and to increase the capacity of the company: 1. Measure 1 – Replacement of bridge sawing machines; 2. Measure 2 – Replacement of a processing plant; 3. Measure 3 – Replacement of the Ludacoste MBM machine. The specific measures are based on the recommendations included in the Energy Efficiency Audit, approved by the Sustainable Energy Development Agency (SEDA) by Opinion No BG16RFOP-576/ 29.08.2016. The realization of the project and the foreseen measures will result in: * Annual energy savings amounting to 197 805 kWh; * Planned energy savings (PES) amounting to 77.51 %; * Total energy efficiency ratio (EER): 81.48%; The period of investment repayment is 5.35 years, at an internal rate of return of 18.02 %. The following activities will be implemented during project realization: Element A “Investment”: * Investments aimed to implement the planned energy efficiency measures - supplier selection, supply, installation and commissioning of the equipment. Element B “Services”: * Energy efficiency audit; * Integration and certification of an Energy Management System in accordance with the requirements of the standard BDS EN 50001 (Energy Management Systems)/EN ISO 50001; * Publicity and visualization. Total project budget is 812 578,60 BGN, VAT excl. Planned project duration is 18 months.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 21 Aug, 2017
End date 10 Jun, 2019
Contract date 21 Aug, 2017
View in UMIS

Beneficiary

Financial information

Total cost 812,578.60
Grant 576,932.82
Self finance 235,645.78
Total paid 575,192.90
EU participation percent 85.0%

Location