Reducing energy consumption and increasing productiveness and energy efficiency of "3 M GRUP 3" JSC

The implementation of a system of measures for improving energy efficiency of "3 M 3 GRUP" JSC will lead to significant reduction in energy costs, as well as social and environmental benefits. The purchase of new machines will lead to higher productivity and lower energy consumption per unit of production. Pursuant to the conducted energy audit, the following measures are envisaged: Measure 1 - Replacement of 3 old tracked excavators with 3 new ones with higher productivity and lower energy consumption Measure 2 - Replacement of the old wheel excavator with a new one with higher productivity and lower energy consumption Measure 3 - Replacement of the old loader with a new one with higher productivity and lower energy consumption Measure 4 - Replacement of the old mini loader with a new one with higher productivity and lower energy consumption Measure 5 - Replacement of the old telescopic hander with a new one with higher productivity and lower energy consumption These measures are important not only because they will provide significantly higher performance in the production process of "3 M GRUP 3" JSC., but also because the production will be significantly more energy-efficient and will lead to a significant reduction of harmful emissions.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 21 Aug, 2017
End date 23 Oct, 2019
Contract date 21 Aug, 2017
View in UMIS

Beneficiary

Financial information

Total cost 1,649,889.00
Grant 1,162,502.30
Self finance 487,386.70
Total paid 660,481.00
EU participation percent 85.0%