The implementation of a system of measures for improving energy efficiency of "3 M 3 GRUP" JSC will lead to significant reduction in energy costs, as well as social and environmental benefits. The purchase of new machines will lead to higher productivity and lower energy consumption per unit of production. Pursuant to the conducted energy audit, the following measures are envisaged: Measure 1 - Replacement of 3 old tracked excavators with 3 new ones with higher productivity and lower energy consumption Measure 2 - Replacement of the old wheel excavator with a new one with higher productivity and lower energy consumption Measure 3 - Replacement of the old loader with a new one with higher productivity and lower energy consumption Measure 4 - Replacement of the old mini loader with a new one with higher productivity and lower energy consumption Measure 5 - Replacement of the old telescopic hander with a new one with higher productivity and lower energy consumption These measures are important not only because they will provide significantly higher performance in the production process of "3 M GRUP 3" JSC., but also because the production will be significantly more energy-efficient and will lead to a significant reduction of harmful emissions.
Overview
Status | Closed (completion date) |
---|---|
Start date | 21 Aug, 2017 |
End date | 23 Oct, 2019 |
Contract date | 21 Aug, 2017 |
Programme
Beneficiary
Financial information
Total cost | 1,649,889.00 |
---|---|
Grant | 1,162,502.30 |
Self finance | 487,386.70 |
Total paid | 660,481.00 |
EU participation percent | 85.0% |
Location