The project proposal on "Patstroy - Gabrovo" AD provides for increased production of the company and increase its competitiveness by being purchased new equipment with higher technological capabilities, integrated system for heat recovery system for monitoring energy consumption: - Installation for the production of polymer modified bitumen (1 measure of energy audits); - A system for monitoring energy consumption (measure 2 by the Energy Audit); - Ventilation with heat recovery to heat recovery (measure 3 Energy audit). After integrating the above mentioned technological equipment, the production capacity of the enterprise will grow significantly, which in turn will reduce fuel costs greatly, as well as energy consumption per unit of production. "Patstroy - Gabrovo" AD provides the project to introduce a system of energy management / energy management / certification and BS EN ISO 50001. These actions will reduce the cost of energy resources, limiting the consumption of energy and resources thus - environmental protection, and continuously measuring and analyzing energy efficiency.
Overview
Status | Closed (completion date) |
---|---|
Start date | 18 Aug, 2017 |
End date | 05 Nov, 2018 |
Contract date | 18 Aug, 2017 |
Programme
Beneficiary
Financial information
Total cost | 458,700.00 |
---|---|
Grant | 328,670.00 |
Self finance | 130,030.00 |
Total paid | 327,925.02 |
EU participation percent | 85.0% |
Location