Increasing the energy efficiency of MAKSTROY Ltd.

Company "MAKSTROY" EOOD. Montana mining and producing building materials - limestone and various factions from the "Lower Vernitsa", territory. Lower Verenitsa municipality. Montana. The company is concessionaire of the deposit under a concession contract for 35 years. By 2015, extraction and production is carried out by subcontractors, the company sold only rock. From 2016 he performed alone mining and processing of rock through the active work of already developed career with external and internal career paths, cleared areas of overburden. And now career processed different fractions of crushed stone for the production of asphalt to fill and concrete centers. The concession area is 249 acres in the village of. Lower Verenitsa common. Montana. In 2015, "MAKSTROY" Ltd has signed a contract with "Trace Sofia" Ltd. for the sale of large amounts of rock, which by extension is subsequently amended in a contract award. The agreed price of this service is complex ie It includes drilling and blasting in mining, loading and unloading with an excavator and loader crushing and sifting the material. All expenses are included in this price. The technology is as follows: rock massif exploded and depending on the needs of customers obtained raw material is sold as rocks without additional crushing and different factions (ie. 63 mm and 40 mm, which are obtained by crushing and sieving of MET). The product is limestone, but the pieces are of different sizes. The whole process is done by "Trace Sofia" AD, which in turn has benefited from the services of other companies, mainly "USM" Stara Zagora. Through the project proposal will be purchased crushing and screening plant (Unit 1) tracked excavator (Measure 2) wheel loader (Measure 3), after their commissioning will lead to optimization of energy costs, expanding production activity and increase competitive power of "MAKSTROY" LTD.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 09 Aug, 2017
End date 21 Jun, 2019
Contract date 09 Aug, 2017
View in UMIS

Beneficiary

Financial information

Total cost 2,065,920.00
Grant 1,453,724.00
Self finance 612,196.00
Total paid 1,450,915.10
EU participation percent 85.0%

Location