This project envisages the purchase of a new highly efficient asphalt mixer (installation for the production of bituminous mixtures and asphalt mix) (Measure 1), a new mobile MET, a mechanical ventilation installation for utilization of residual heat (Measure 3) and an automated monitoring system And control of energy consumption (Measure 4). The purchase of new technological equipment from the Energy Audit will replace some of the existing. After integrating the above-mentioned technological equipment, the production capacity of the production plant will increase significantly, which in turn will lead to more orders and lower energy consumption per unit of output. The implementation of the machines and equipment set up in the energy audit will lead to a higher level of competitiveness of AB. The project will have a implementation period of 24 months and will amount to BGN 5 328 162.30 lv
Overview
Status | Closed (completion date) |
---|---|
Start date | 18 Dec, 2017 |
End date | 20 Feb, 2020 |
Contract date | 18 Dec, 2017 |
Programme
Beneficiary
Financial information
Total cost | 5,328,162.30 |
---|---|
Grant | 2,491,217.00 |
Self finance | 2,836,945.30 |
Total paid | 2,490,415.22 |
EU participation percent | 85.0% |
Location