Implementation of energy efficiency measures in AB

This project envisages the purchase of a new highly efficient asphalt mixer (installation for the production of bituminous mixtures and asphalt mix) (Measure 1), a new mobile MET, a mechanical ventilation installation for utilization of residual heat (Measure 3) and an automated monitoring system And control of energy consumption (Measure 4). The purchase of new technological equipment from the Energy Audit will replace some of the existing. After integrating the above-mentioned technological equipment, the production capacity of the production plant will increase significantly, which in turn will lead to more orders and lower energy consumption per unit of output. The implementation of the machines and equipment set up in the energy audit will lead to a higher level of competitiveness of AB. The project will have a implementation period of 24 months and will amount to BGN 5 328 162.30 lv

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 18 Dec, 2017
End date 20 Feb, 2020
Contract date 18 Dec, 2017
View in UMIS

Beneficiary

Financial information

Total cost 5,328,162.30
Grant 2,491,217.00
Self finance 2,836,945.30
Total paid 2,490,415.22
EU participation percent 85.0%

Location