The purpose of this project proposal is to increase the energy efficiency and production capacity of Panchim OOD through the purchase of new modern and high performance equipment. The project envisages the purchasing of installation for the extrusion of flat sheet in PMMA, PC-UVPC, which is characterized by significantly improved performance and low energy consumption. Within the framework of the project proposal it also planned the construction of a waste heat recovery system and the implementation of ISO 50001. As a result of the implementation of these measures, the amount of energy used and that of spent negative carbon emissions from production will be reduced, which will help to protect the environment and improve the competitiveness of the company. The planned energy savings for the plant as a result of project implementation (PES) will be 29.96% or 12 637 656.42 kWh / year. The efficiency of the investment as a ratio of the amount of energy saved in kWh. on an annual basis compared to the required investment in BGN (kWh / BGN) will be 2.63 kWh / lv. carbon dioxide emissions savings of 103 350.24 t/yr.
Overview
Status | Closed (completion date) |
---|---|
Start date | 28 Dec, 2017 |
End date | 29 Nov, 2019 |
Contract date | 28 Dec, 2017 |
Programme
Beneficiary
Financial information
Total cost | 4,825,472.00 |
---|---|
Grant | 2,412,736.00 |
Self finance | 2,412,736.00 |
Total paid | 2,411,685.94 |
EU participation percent | 85.0% |
Location