The present project envisages the purchase and commissioning of new energy-efficient equipment, recommended by the four energy audit measures, namely: a new Mobile Recycling System for Earth masses (Measure 1), a new Mobile Vacuum Excavation System (Measure 2) , A new microtunnel system (Measure 3) and an automated system for energy consumption monitoring and control (Measure 4). All new assets have high performance and low power consumption. Following the introduction of the assets to be purchased, the amount of energy savings of the plant and the amount of carbon dioxide emissions saved thanks to energy-efficient machinery will increase significantly. The project also envisages the introduction of a BMS EN ISO 50001 energy management and certification system. These activities will lead to reduced costs for energy resources, limiting the consumption of energy resources and thus protecting the environment. The project will have a term of execution of 24 months and will total 5 050 141.00 BGN without VAT.
Overview
Status | Closed (completion date) |
---|---|
Start date | 01 Aug, 2018 |
End date | 13 Nov, 2020 |
Contract date | 01 Aug, 2018 |
Programme
Beneficiary
Financial information
Total cost | 5,050,141.00 |
---|---|
Grant | 2,497,594.47 |
Self finance | 2,552,546.53 |
Total paid | 2,497,149.20 |
EU participation percent | 85.0% |
Location