Renewable energy in the municipal educational infrastructure in the town of Velingrad, municipality of Velingrad

The project proposal includes construction of a geothermal heat pump installation for heating, cooling and domestic hot water supply in the building of the kindergarten "Edelweiss", located at Velingrad Municipality, Velingrad, 4 Dobri Chintulov Str. The internal modules of the system / water-to-water heat pumps / will be located in the existing boiler room. External circle: it consists of vertical drills, in each of which a geothermal set is installed and subsequent injection of the necessary materials. The system will provide energy transfer between the ground and the indoor units of the heat pump system. Water-to-water heat pump units. Internal circuit: the hot or cold water received from the heat pump units enters a buffer vessel from which it will go to the heating / cooling pipe system through a circulation pump. It is planned to supply a new boiler for domestic hot water supply. A central water pump heating installation is provided - a closed system. The premises will be heated and cooled by fan convectors. In order to ensure energy monitoring, means for measuring and controlling the heat consumption will be installed.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 10 Mar, 2022
End date 10 Sep, 2023
Contract date 10 Mar, 2022
View in UMIS

Financial information

Total cost 471,280.00
Grant 400,280.00
Self finance 71,000.00
Total paid 120,084.00
EU participation percent 85.0%