The project envisages a change in the energy source for heat supply of the High School“St. St. Cyril and Methodius". Existing position: - School SU "St. St. Cyril and Methodius "is 100% municipal property. It consists of three buildings that have been renovated and for which an energy efficiency project has been prepared. - The heating installation / SAI / of the school is water-pumped with forced circulation. 3 branches of the heating installation of the school are supplied by means of collectors. According to the working design for heating, the calculated heat load is 350,000 kcal / h - 407,000 W. The project treats the construction of a new water supply pipeline, supplying heat to the consumer installations / SAI and DHW / of the school buildings of “St. Cyril and Methodius” located in the town of Strelcha. The necessary energy for the heating and cooling of the school building will be obtained from two independent mineral water springs. One is "Sondazh 1 - HG" located in the park in front of the municipal Mineral Bath - Strelcha, and the other is in the same park, but located behind the monument of Khan Asparuh, currently used for irrigation of soil areas in the park. The project concerns the construction of a reservoir next to the southern wall of "Sondazh 1 - HG". The existing state of the spring represents a drilling and direct distribution collector.
Overview
Status | In execution (starting date) |
---|---|
Start date | 10 Mar, 2022 |
End date | 10 Sep, 2023 |
Contract date | 10 Mar, 2022 |
Beneficiary
Financial information
Total cost | 692,989.14 |
---|---|
Grant | 692,989.14 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 85.0% |
Location