This project proposal is aimed at implementing energy efficiency measures and modernisation of part of the external artificial lighting system in Ruse. It includes the neighborhoods “Druzhba-1”, “Druzhba-2”, “Druzhba-3”, “Charodeyka-North”, “Charodeyka-South” and the main streets – “Hristo Botev” Blvd, “Gotse Delchev” Blvd, “Vasil Levski” Blvd, “Bulgaria” Blvd, “Lipnik” Blvd, “Pliska” Str, “Naum” Str, “Dorostol” Str, “Tutrakan” Blvd. The following measures are envisaged: replacement of luminaires with new LED luminaries and introduction of an information system for planning, monitoring, control of electricity costs for street lighting; introduction (construction) of a local system for automatic control of 3 streets; installation of photovoltaic system for production of electricity for own needs. The project will be implemented in partnership with Executive Decision Support AS - Norway, which will participate in experience exchange activities.
Overview
Status | In execution (starting date) |
---|---|
Start date | 15 Sep, 2021 |
End date | 15 Dec, 2023 |
Contract date | 15 Sep, 2021 |
Beneficiary
Financial information
Total cost | 1,541,364.89 |
---|---|
Grant | 783,289.09 |
Self finance | 758,075.80 |
Total paid | 234,986.00 |
EU participation percent | 85.0% |
Location