Rehabilitation and Modernization of Municipal Infrastructure — Systems for External Artificial Lighting of Velingrad

Project is aimed at reconstruction and modernization of the municipal infrastructure-systems for external artificial illumination of the town of Velingrad, through implementation of 2 main energy saving measures (ESM), recommended in an approved Energy audit. In the context of national efforts to reduce energy consumption and import dependency on energy resources and to the extent that street lighting is one of the major energy consumers in municipalities, which influences the growth of energy Consumption in recent years, the project aims to optimise the energy consumption of the urban system for outdoor street lighting in Velingrad and improve the living conditions of the population. The recommended ESM 1 consists in delivery and installation of new luminaires (replacement of available old ones)-285 PCs. 80 W, 823 PCs. 40 W, 30 PCs. 25W, 1046 PCs. 20 W, 25 PCs. 15 W. EMC 2 consists of the introduction of the intelligent system for automated management, control and monitoring of the MA with included software, hardware and equipment at the dispatching point. The implementation of the project will take place in partnership between the municipal administration-Velingrad and specialized Norwegian company Sigra Group, Oslo for exchange of experience and know-how in the field of realization of the ESM for energy efficient external artificial lighting. The project includes measures to ensure publicity and visualization, the team of the candidate, formed for the realization of the project proposal, is qualified and with previous 3 years relevant experience, a high degree of readiness of the project Proposal-prepared and validated according to Spatial Planning Act work design (option 1). The main expected results of the implementation of the project are the achievement of annual reduction of CO2 emissions over 800 t; annual energy saving in the amount of 1025,7 MWh, i.e. 87,8% of the street lighting's energy consumption in Velingrad; annual cash savings-119549,97 BGN.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 07 Apr, 2021
End date 07 Oct, 2022
Contract date 07 Apr, 2021
View in UMIS

Financial information

Total cost 782,505.60
Grant 782,505.60
Self finance 0.00
Total paid 0.00
EU participation percent 85.0%