The project proposal is under the procedure "Rehabilitation and modernization of municipal infrastructure-External artificial lighting systems of municipalities under the EEA FM 2014-2021. Within the project, in 4 settlements of the municipality of Pomorie, by replacing all luminaires with modern LED and standalone photovoltaic lamps, with reduced energy losses, by introducing a system for monitoring energy consumption and managing the lighting systems through a central software platform for management will increase the EE of the SVIO, owned by the municipality and improve the living conditions of the population. The existing status of the SVIO in the settlements - the villages of Kamenar, Kableshkovo, Aheloy and Pomorie leads to significant over-consumption of electricity. The luminaires have been replaced erratically without seeking regulatory compliance. Within the framework of the project, on the basis of a developed and approved working project, all the measures proposed in the SEA EE survey report will be implemented. Construction and copyright supervision, info and publicity, project management and audit will be performed. In order to exchange experience, knowledge and best practices at management and expert level, the municipality of Pomorie will implement the project in partnership with the MP Energy, Norway. For the successful implementation of the project, the Beneficiary will carry out procedures in accordance with the PPA requirements for the selection of contractors for the project activities, will participate with its representatives in the project team and will control the strict implementation of the planned activities. As a result of the implementation of the project on the territory of the municipality, the annual reductions in CO2 emissions will be 920.59 tonnes, the annual energy savings will be 780.16 MWh/year, and the annual monetary savings will be BGN 133514. Better living conditions will be created for 19323 inhabitants of the municipality.
Overview
Status | In execution (starting date) |
---|---|
Start date | 26 Feb, 2021 |
End date | 26 Aug, 2022 |
Contract date | 26 Feb, 2021 |
Beneficiary
Financial information
Total cost | 784,934.35 |
---|---|
Grant | 784,934.35 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 85.0% |
Location